Construction platform for Peace Parks
And the Park of Civilization.
> BUILDING SYSTEM
PARKS OF THE WORLD • EQUILIBRIUM • CLT
TECHNOLOGIES
Base - CLT (cross-glued wood)
?It's not just a material ?It's a new construction industry
Key properties:
- High Strength
- seismic resistance (up to 9 points)
- Fire Resistance
- Eco-friendly
- Stable geometry
Recognized as one of the best materials in the world
MAIN ADVANTAGE
> SPEED
Construction period: up to 3 months
What it gives:
- Quick start of projects
- quick return on investment
- Scaling the network of parks
WHERE TO USE IN OUR SYSTEM
> tourism
- Aparthotels
- Bungalows
- Hotels
- Resorts
> Education
- School
- Universities
- Laboratory
> Social facilities
- Rehabilitation Centers
- Medical Centers
> Commerce
- Restaurants
- Cafe
- Pavilions
All this is directly provided by technology
UNIQUENESS FOR OUR PROJECT
This is where you have a strong competitive advantage.
1 - CONSTRUCTION IN MOUNTAINS
> Features:
- construction on the slopes
- overhanging structures up to 15 m
- working in difficult conditions
Ideal for:
- Krasnaya Polyana
- Canyons
- Mountain Parks
2 - PARKING ARCHITECTURE
- Home over the cliffs
- Restaurants over the gorges
- the observation area
This is a wow effect for tourism.
3 - SEA PROJECTS
- Coastal development
- Yacht Clubs
- Lagoons
* expressly provided for
CONSTRUCTION ECONOMY
Cost reduction:
- lightweight material → cheaper foundation
- factory readiness
- Minimum of workers
Operation:
- low energy consumption
- high thermal insulation
- Durability
? It gives: ? REDUCTION CAPEX AND OPEX
PRODUCTION MASTER
> Before 300 000 m² per year
This means: YOU CAN BUILD NETWORK PARKS
STRATEGIC LEVEL
The project is related to:
- the President of the Russian Federation
- Construction Programs
- Development of Territories
This opens: ACCESS TO THE STATE
INTEGRATION IN OUR SYSTEM
Parks of the World — Architecture of Spaces
Marine parks — light coastal structures
Transport — stations and nodes
University - Campuses
Everything is built on one technology
- Transport
- economy
- Ecology
- Construction
This is already: THE FULL SYSTEM OF CITIES
THE MOST IMPORTANT CONCLUSION CLT He gives us what we do not have 90% Projects:
👉 SPEED OF SCALING
The next step. Now you can make a very strong bond:
"TYPE MODULES PARK"
- Hotel
- Pavilion
- the Knowledge Tower
- Transport Station
"PARK PLANT"
Serial production of parks
"FRANCHISING OF CONSTRUCTION"
CATALOGUE MODULE +
« PARKS OF THE WORLD
PARK MODULE CATALOG
This is the key: . . . each park is assembled as a designer
? 1. THE NUCLEAR (THE MEANING) HOUSE OF KNOWLEDGE
Functions:
- Library
- Lecture Halls
- Control Center
Area: 3 000 – 10 000 m²
? 2. EDUCATION > ACADEMY / UNIVERSITY
- Audience
- Laboratory
- Research Centers
? 3. RESIDENTIAL ENVIRONMENT > HOTELS / BUNGALO
From your project:
- 50–150 m² Modules
- Scalable
> VILLA
- Premium segment
- Mountain / Sea
? 4. CULTURE > THEATERS
- Open Amphitheatres
- Closed Scenes
? ALLEYA GENEV
- Sculptures
- Interactive Zones
? 5. SCIENCE > LABORATORY
- Physics
- Chemistry
- Biology
FONTANES FORMULA
- visualization of science
- Educational attractions
? 6. TRANSPORT > STATIONS
- String Transport
- Cable Lines
« HOUSE
- Transplant
- Service
? 7. NATURAL > GARDENS
- 7 / 13 Gardens
- Thematic areas
The Lagoon.
- Marine Zones
- Biosphere
? 8. COMMERCIAL > RESTAURANTS
- Panoramic
- Thematic
> TRADE AREAS
? CATALOGUE FORMULA ? Park = set of modules
WORLD PARKING FACTORY. This is where the real scale begins.
> The Concept
Not to build parks, to build parks.
Basic principle: "PARK AS A PRODUCT" PRODUCTION
- CLT Panels
- Modular Designs
- Factory Assembly
High readiness of elements
What is produced:
- Buildings
- Stations
- Bridges
- Pavilions
QUICKNESS up to 3 months per facility
This gives: MASS DEVELOPMENT
STRUCTURE OF THE PLANT
Block 1 — Production
- CLT Panels
- Design
Block 2 - Design
- BIM
- master plans
- Modules
Block 3 — Logistics
- delivery
- installation
Block 4 - Assembly
- Quick installation
- minimum command
PRODUCTS OF THE PLANT
1 - Park (turnkey)
- Full Set
2 - Modules
- individual objects
3 - Franchise
- Brand
- system
- learning
FACTORY ECONOMY
Income:
- Sale of parks
- sale of modules
- Licenses
Scale:
👉 10 Parks = Business
👉 100 Parks = system
👉 1000 Parks = new industry
STRATEGIC LEVEL
? not development ? not tourism
"CREATION INDUSTRY OF CITIES AND PARKS"
RELATIONSHIP WITH OUR SYSTEM
STRONG COUNTRY UNION
Operator
EQUILIBRIUM
architecture
FENIX
people
KRISTALL741
system
EQUILIBRIUM
Balance
HONESTLY (IMPORTANT)
We have now reached the level of: Tesla, but in construction and territories
INVEST-PROJECT "PARK PLANT"
PROJECT ESSENCE Creation of an industrial complex:
- production of parks, cities and infrastructure
Product:
- "Turnkey" parks
- Modular Buildings
- tourist infrastructure
- Transport hubs
> It's "PARK AS A SERIAL PRODUCT"
The growing market segments:
- Tourism
- Domestic Tourism of Russia
- Ecotourism
- Resort Construction
- Infrastructure of regions
State demand:
- development of territories
- National Projects
- Reconstruction of regions
- Tourism
Market: trillions of rubles
PRODUCTS OF THE PLANT
1 - Basic modules
- Hotels
- Villas
- Pavilions
- Stations
2 - Complexes
- park (10–30 ha)
- megapark (100+ ha)
3 - Infrastructure
- Bridges
- Stations
- observation decks
PRODUCTION
Base:
- CLT Panels
- Factory Assembly
- Ready-made home kits
Options:
- to 300 000 m² per year
- High automation
Implementation period:
- 6–12 months factory start-up
- 3 months construction of objects
INVESTMENTS (CAPEX)
Factory:
- Equipment: 3–6 billion ₽
- Infrastructure: 1–3 billion ₽
- Launch: 1 billion ₽
> TOTAL: 5 – 10 billion ₽
INCOME
1 park (medium):
- 5–20 billion ₽
Factory:
- 3–10 parks per year
> GIRL: 20 – 100 billion ₽ / year
MARGINALITY
- Margin: 20–40%
: 5 – 30 billion ₽ / year
DURABILITY
1,5 - 3 years
BUSINESS MODEL
1 - Parks for sale
2 - Franchising
3 - State orders
4 - Export
GEOGRAPHY
Russia:
- Sochi
- Crimea
- Caucasus
- Far East
World:
- Asia
- Middle East
- Africa
STRATEGIC LEVEL
It is important to understand: ? we create:
> NEW INDUSTRY
"PARKING AND CITIZEN INDUSTRY"
STATE FACTOR
The project corresponds to:
- National Projects
- Tourism
- Construction
- import substitution
You can enter through:
- Minstroy
- Ministry of Economy
- the Development Corporation
RISKS (honestly). Main:
- Underfunding
- Weak packaging
- Absence of pilot
Solution: start with Sochi (pilot)
The Concept
. technology
> economy
> scale
This is a rare case:
"Idea + INDUSTRY"
> SOCHI
PILOT PROJECT
"PARKS OF THE WORLD • EQUILIBRIUM • MARINE LAGOON"
LOCATION (KEY)
Sochi — Hosta / Krasnaya Polyana / coastal zone
Why this is the perfect pilot:
- sea + mountains (unique)
- year-round tourism
- Ready-made infrastructure
- Federal status
This is the best place in Russia to launch
STRUCTURE OF THE PROJECT
Block 1 - Sea Lagoon
- Artificial Reef
- Protected water area
- Bungalows on the water
- Yacht Club
Block 2 - Mountain Park
- observation decks
- Floating Hotels
- Ecotropes
- Canyons
Block 3 - Park of Knowledge
- Temple of Knowledge
- Pavilions of Sciences
- Alley of Geniuses
Block 4 — TRANSPORT
- String Lines
- Cable Car
- Sea Routes
MASSHTAB
Area:
- land: 50–120 ha
- water: 2–10 ha
Objects:
- 100+ buildings
- 20+ transport stations
- 1 central hub
INVESTMENTS. Structure:
🌊 Marine part
2 – 5 billion ₽
Construction (CLT)
5 – 15 billion ₽
> Transport
5 – 10 billion ₽
> TOTAL: 12 – 30 billion ₽
INCOME
1. Tourism
- Hotels
- Bungalows
- Park
👉 5 – 15 billion ₽ / year
2. Transport
👉 1 – 5 billion ₽ / year
3. Commerce
👉 1 – 3 billion ₽ / year
: 10 – 25 billion ₽ / year
BUYING CAPACITY > 3 – 5 years (with proper loading - faster)
SOCHI UNIQUENESS
Nowhere in Russia:
- Sea
- Mountain
- Canyons
- Finished Tourism
in one place!
HOW TO SUBMIT IT? Don't say ? park ? resort. Say:
"PILOT MODEL OF SPACE DEVELOPMENT OF RUSSIA"
WHO IS THE TARGET CUSTOMER
State:
- Minstroy
- Ministry of Economy
- Corporation Tourism.RF
Private investors:
- Developers
- Funds
- Big Business
WHAT TO DO NOW
1 - Select a plot (very specific)
without this all theory
2 - Make 10-slide pitch
Short and hard
3 - Entry into the administration of Sochi
4 - Connect the federal level
HONEST. We are at the point now:
Either it will become a pilot of the country or it will remain a concept.
The Next Step
? 1. PITCH DEK SOCHI (ready for investors)
? 2. SCHEME OF THE PARTICIPATION (real layout)
? 3. LETTER TO THE ADMINISTRATION