← OCEAN 80Author's presentation · archiveequilibrium-system.com

Archive version of the author's presentation. These parameters, forecasts and financial models reflect the content of the source material and do not confirm the actual result or guarantee. Current program card.

National programme · Shipbuilding

OCEAN 80Revival of the Russian Navy

Sea and river fleet of the new generation: dredgers with productivity 26 800 m³/h, seven multi-functional shipyards on 30 vessels per year and dredging of key transport corridors. Real ships have already been built - the project is ready for an investment launch.

26 800
m³/ground rise time - dredger performance
×10–33
to existing USC courts (≈900 m³/h)
22,78 trillion ₽
full investment program
30/year
Ships with one multi-functional shipyard

The State Task

Russia needs a navy.

the Government of the Russian Federation 5 November 2021 № 2868-R approved construction program more 250 Sea Transport Vessels, 1500 "River-sea" vessels, 1640 Fishery, 350 Dredgers, 90 Scientific Court and 24 Icebreakers. North-South, One Belt, One Road, and Northern Sea Route corridors need sufficient depth — and therefore, powerful dredging.

250+
Ships under the state program
+ 1500 "River-sea" class vessels
350
Landscaping is required by the country
dredging of rivers, canals and fairways
24
icebreakers for the Northern Sea Route
year-round navigation in the Arctic

Technological superiority

Productivity not available in the industry

The USC is now building land-sink shells to 900 m³/h Our ice-class dredgers are up 8 000 and 26 800 m³ the Ground Hour 10–33 Faster than that. This multiplies the dredging of rivers and seas.

USC (industry)Current Park
≈900 m³/h
OCEAN 80 · BasicIce-class dredger
8 000 m³/h
OCEAN 80 · Flagship"river-sea", 171 m
26 800 m³/h

Finished solution

Ships have been built. Shipyards are the next step

In 2023, OCEAN signed a contract with the Chinese SOURCE TECHNOLOGY LIMITED for the construction of three ice-class dredgers without prepayment. Eight months later, the ships were built, passed sea trials and are ready for transfer to Russia. The Chinese shipyard is ready to supply a set of equipment for seven multifunctional shipyards - 30 vessels per year each.

01

3 Dredger

Ice class, built and tested in China. Ready to transfer.

02

7 Shipyards

Sets of multifunctional shipyards: 30 vessels per year each.

03

6 sites

Mariupol, Astrakhan, Kostroma, Taganrog, Vladivostok, Omsk — 20 ha.

04

Import substitution

Sero concrete, composite fittings, marine engines - localization in Russia.

A fleet already on the water.

The Power That Builds a Maritime Power

From dredging the Arctic fairways to ocean fishing is a unified program for the revival of the Russian fleet.

Nomenclature

A complete line of new generation vessels

Dredging, cargo transportation, fishing and energy - a single shipyard covers the entire spectrum.

Investment program

Where capital goes

The program is structured in directions - from payment for already built ships to dredging of the Volga and construction of shipyards.

Investment mechanism

Protected model through OFZ

Return to the investor is provided with government bonds of the federal loan. Transparent structure for 15 years through PJSC "Promsvyazbank".

01

Purchase of OFZ

Investor acquires OFZ nominal value 20 trillion ₽ by price 40% from the denomination, the term 15 years.

02

Yield 15%

The investor annually receives 15% from the nominal value of OFZ as a commission.

03

Project credit

OCEAN 80 takes 60% funds at 2% per annum, deferment of the first payment of 3 years.

04

Implementation

Funds go to the national project "Shipbuilding" - shipyards, ships, dredging.

The full financial model, details and draft investment agreement are provided upon request.

Feasibility study

Unit Economics of the Flagship Dredger

Calculation for one year of two-shift work: ground rise, transportation at 10 km, emission at great depths. Customers — FSUE "Hydrographic enterprise" (SMP) and "Rosmorrechflot".

38,5 billion ₽
Annual revenue of the flagship dredger
at a rate of 1 000 ₽ for m³ soil
17,9 billion ₽
Net profit after tax
expenditure 16,2 billion ₽ · Income Tax 20%
36%
profitability of the flagship vessel
Annual Return to Investor 4 billion ₽

Legal framework

Participant status and guarantees

The project is implemented by a resident of the free economic zone under the management of the public law company "Territory Development Fund".

Enter the project that builds the country's fleet

OCEAN 80 opens participation for investors, banks and industrial partners. We will discuss the format of entry, the roadmap and the financial model.

OOO "OKEAN 80" · Moscow, st. Krasnodonskaya 23/2 · 030350@bk.ru · +7 968 533 36 44

Part of the ecosystem